Promsa participates by supplying concrete in the work of the port of Barcelona that is being carried out by the UTE Potasas.
The work, owned by ICL, consists of a plant for receiving, storing and shipping by sea the sodium and potassium salts extracted from the deposit located in Suria-Sallent (Catalonia).
As of today, it is the largest project carried out in Catalonia using structural polymeric fiber, applying it in the execution of pavements to replace conventional reinforcement or steel fiber.
In addition, two elements are added to the complexity of the work: proximity to the sea of the structure and the high content of chlorides typical of the collected material.